Development of work production plans, method statements for crane operation, and flow charts
LLC "PPRK-Service"
Approval of work production plans, method statements for crane operation, and flow charts

Welcome to «PPRK-Service»

LLC «PPRK-Service» was established in 2007. During its operation, PPRK-Service has achieved a strong position in the field of work production plan development not only in St. Petersburg but also in other cities of Russia. We could not have achieved that rapid progress without our experts who has been working for the company from its very first day – those people have over 30 years’ experience in the field. Alongside with them, we have young, vivid, and determined professionals with an innovative approach to performance. Thanks to the current speeds of construction, this combination allows us to meet the requirements of our customers both in terms of quality and time of development of work production plans. 

When necessary, the work production plans developed by us may be approved by all authorized institutions. 

Thanks to the experience we have accumulated in the development of method statements for crane operation, we know the industrial safety requirements in and out, and take them into account when developing work production plans, which allows us to obtain positive findings of an industrial safety expert review in the shortest time possible. 

Our success is affirmed by work production plans developed by our company in various fields of construction. We are experienced in working with civil construction companies (earthworks, installation of foundations, construction of building frames, roofing, interior finishing, installation of utilities, equipment, etc.), and specialized companies engaged in the field of road construction, laying of oil and gas pipelines, installation of communication lines and power lines, installation of special-purpose equipment, etc. 

We develop reasonably priced work production plans, method statements for crane operation, and flow charts of high quality. 

Long-term cooperation is our goal. We apply the customized approach, strive for mutual understanding, and value both professionalism and faithfulness. 

 

girl1.png

-Steps and rules PPR-

A work production plan should be approved by the head of a general contracting construction and installation company, while a method statement for crane operation should be approved by the head of the relevant subcontracting company as agreed with the general contractor. 

The head or their representative being in charge of the company then approves the work production plan for refurbishment, extension, and technical re-equipment of the operating production (building, facility). 

The persons who approve work production plans shall be certified professionals in industrial safety at hazardous industrial facilities within the scope of the relevant regulations. 

A work production plan with the use of hoisting equipment is approved by owners of such equipment.  

Deviations from CMS solutions are allowed in the work production plan development only with prior approval of the company developed CMS. 

Areas of industrial hazard related to technical processes and working conditions, when using hoisting equipment, shall be determined in accordance with SNiP 12-03-2001 in construction method statement (CMS), others – in the work production plan.

When developing design solutions for the arrangement of construction and production sites or work areas, it is vital to determine areas hazardous for people.

The work production plan is then delivered to the construction site prior to the commencement of works.

Prior to the commencement of construction and installation works with the use of hoisting machinery, the contractor, and administration of the company – owner of the facility – shall issue an operation certificate. 

Signal barriers and safety signs must be installed on the boundaries of hazardous areas. All objects on which hoisting machines are operated are subject to registration in accordance with the Rules for Registration of Objects in the State Register of Hazardous Production Facilities approved by Resolution No. 1371 of the Government of the Russian Federation of November 24, 1998.

Today, the development of work production plans is an integral part of design and construction of civil construction facilities. Those include residential buildings and public facilities. In this field of construction, our company develops the following types of work production plans: 

— zero phase construction – installation of pits, prefabricated, solid-cast or piles foundations, construction of underground structures (parking lots and spaces, cellars);

— construction of superstructures – erection of columns and floor slabs, erection of steel structures, erection and installation of wall envelopes, installation of in situ reinforced concrete structures;

— installation of utilities – heating, ventilation, sewage, water pipelines, air conditioning;

— finishing works;

— site improvement;

— development of method statements for crane operation;

— work production plans with the use of hoisting facilities.

The composition and content of projects for the production of works are established by SNiP 12.01.-2004 «Organization of construction», as well as RD-11-06-2007. The design solutions and measures to be reflected in the projects for the production of work with the use of hoisting machines, in addition, are determined by the Safety Rules for Hazardous Production Facilities using lifting structures approved by Rostechnadzor.

Today, the development of production projects is an integral part in the design and construction of civil engineering projects. These objects primarily include residential buildings and public buildings. In this area of ​​construction, our company develops the following types of production projects (PPR):

construction of the zero cycle — the construction of foundation pits, prefabricated, monolithic and pile foundations, erection of underground structures (parking lots, parking lots, cellars);
construction of the above-ground part of the building — installation of columns and ceilings, installation of metal structures, installation and installation of wall fences, construction of monolithic reinforced concrete structures;
installation of engineering systems — heating, ventilation, sewerage, water supply, air conditioning;
Finishing work;
landscaping;
the development of projects for the production of cranes (PPRC);
projects for the production of work on the use of lifts (PPRP).

Development of work production plans is an integral part of design and construction of industrial construction facilities. Such facilities include production buildings (plants, workshops, factories, production lines), and infrastructure facilities (pumping and transformer stations, administration and amenity facilities, transport infrastructure facilities, etc.). In this field of construction, our company develops the following types of work production plans:

— zero phase construction – installation of pits, prefabricated, solid-cast or piles foundations (drive piles and bored piles, slurry walls), equipment foundations, erection of underground structures;

— construction of superstructures – erection of columns and floor slabs, erection of steel structures, erection and installation of wall envelopes, installation of in situ reinforced concrete structures, mounting-dismantling of gas exhaust ducts, erection of rack structures and galleries;

— installation of utilities – heating, ventilation, sewage, water pipelines, air conditioning, fuel-supply lines;

— equipment installation;

— site improvement, installation of helicopter pads;

— development of method statements for crane operation;

— work production plans with the use of hoisting facilities.

Installation and dismantling of process equipment is crucial in building, reconstructing or refurbishing of production plants and facilities. OOO PPRK-Service has a vast experience in development of work production plans in this field:

development of transportation scheme of equipment delivery;

loading and unloading of large-capacity, large-size equipment from or to the barge, trailer, lowbed semitrailer, railway platform with the use of the following load-lifting equipment — automobile, caterpillar, gantry, bridge, overhead travelling cranes with capacity up to 750 tons, hoisting portal systems with capacity up to 2000 tons.

Installation of process equipment with the use of the following load-lifting equipment – automobile, caterpillar, bridge cranes with capacity up to 750 tons, hoisting portal systems with capacity up to 2000 tons.

Development of work production plans is of importance in building oil and gas pipelines. OOO PPRK-Service has been working as a developer of work production plans in this field for quite a long time. We participated in construction of such facilities as ‘Eastern Siberia – Pacific Ocean’ pipeline system, the Baltic Pipeline System — II (BPS-2), the Bovanenkovo-Ukhta, Ukhta-Torzhok, Gryazovets-Vyborg, Nord Stream, and etc.

Being a developer of work production plans, PPRK-Service is ready to participate in construction of oil and gas facilities, including pipelines, compressor stations, construction of amenities (access roads, electrical power transmission lines, etc.), and installation of process equipment.